Trade

The extension of the pavilion included the supply, manufacture and assembly of metal profiles for the main structure and galvanized profiles for the roof and façade, forming the secondary structure.
The roof was clad with a 5-wave sandwich panel, while the exterior façade received white lacquered trays on the inside, rock wool insulation and a single profiled sheet as a final finish.
This project combines functionality, thermal insulation and durability, highlighting the quality of the solutions implemented by Liscortes.

LOCALITY

Ourique, Portugal

YEAR

2021

EXECUTION TIME

4 months

TONS OF IRON

25.64 Ton