Industry

The project included the supply, manufacture and assembly of metal profiles for the main structure, as well as galvanized profiles for the roof and façade purlins, making up the secondary structure.
For the roof cladding, 5-wave sandwich panels were used, offering an efficient solution for protection and insulation. The façade was clad with a micronervated sandwich panel, carefully applied to ensure durability and resistance.
A simple gutter was also applied along the entire length of the pavilion, made of stainless steel sheeting, ensuring effective drainage.

LOCALITY

Alcanena, Portugal

YEAR

2023

EXECUTION TIME

3 months

TONS OF IRON

14,15 Ton