Industry

The extension of the pavilion included the supply, manufacture and assembly of metal profiles for the main structure and galvanized profiles for the roof and façade, which make up the secondary structure. The roof was made using a double cladding system, consisting of a lower single sheet, separator profile, rock wool insulation and an upper single sheet, providing greater thermal efficiency and protection. On the façades, the exterior cladding included white lacquered trays on the inside, rock wool insulation and a simple corrugated sheet as a final finish. This project stands out for its functionality and the technical quality of the solutions implemented.

LOCALITY

Marinha Grande, Portugal

YEAR

2020

EXECUTION TIME

6 months

TONS OF IRON

33.1 Ton