Industry

The project included the supply, manufacture and assembly of metal profiles for the main structure and mezzanine, as well as galvanized profiles for the roof purlins and the mezzanine floor, forming the secondary structure.
A 5-wave sandwich panel was used for the roof cladding. The installation of double gutters along the entire length of the pavilion included a lower gutter in lacquered sheet metal, mineral wool insulation and an outer gutter in stainless steel sheet metal, guaranteeing efficient drainage.
The exterior façades were fitted with a horizontally applied micronervated sandwich panel, offering a robust and aesthetically appealing finish. In the mezzanine, the interior floors were covered with standard MDF, while the exterior floors were covered with collaborative sheet metal, meeting the requirements of functionality and resistance.
This project reflects the versatility of our team, offering complete, high-quality solutions.

LOCALITY

Évora, Portugal

YEAR

2023

EXECUTION TIME

6 months

TONS OF IRON

105.9 Ton