Trade

The project included the supply, manufacture and assembly of metal profiles for the main structure and galvanized profiles for the secondary structure.
For the exterior cladding of the façade, galvanized trays, rock wool insulation and corrugated single sheet were used, guaranteeing thermal efficiency and durability.
The roof was clad with corrugated single sheet, supplied and assembled to provide a functional and resistant solution.

LOCALITY

Ourique, Portugal

YEAR

2024

EXECUTION TIME

3 months

TONS OF IRON

8.25 Ton