Industry

The project included the supply, manufacture and assembly of metal profiles for the main structure and galvanized profiles for the secondary structure.
The roof was clad with sandwich panels, while the façade and counter-façade were clad with sandwich panels and single profiled sheet metal, guaranteeing durability, insulation and thermal efficiency.

LOCALITY

Leiria, Portugal

YEAR

2024

EXECUTION TIME

5 months

TONS OF IRON

16.48 Ton