Industry

The project involved the supply and manufacture of metal profiles for the main structure and galvanized profiles for the roof and façade, making up the secondary structure.
For the roof cladding, sandwich panel roofing was used, while the façades received micronervated sandwich paneling, both supplied and installed by our team.
The metal structure was treated by hot-dip galvanizing, offering greater protection against corrosion and guaranteeing the durability of the project over time.

LOCALITY

Angola

YEAR

2021

EXECUTION TIME

3 months

TONS OF IRON

17.17 Ton