Industry

The project included the supply and manufacture of metal profiles for the main structure and galvanized profiles for the roof and façade, forming the secondary structure.
The roof cladding was made using sandwich panel roofing, while the façades received micronervated sandwich paneling, guaranteeing high-quality insulation and finish.
The entire metal structure was treated with hot-dip galvanizing, providing greater protection against corrosion and ensuring the durability of the project.

LOCALITY

Angola

YEAR

2021

EXECUTION TIME

3 months

TONS OF IRON

36.76 Ton